Special projects
Zwevegem Site Transfo
- Client / Gemeentebestuur Zwevegem
- Designer / TV COUSSÉE & GORIS architecten / RCR Aranda Pigem Vilalta Arquitectes
- Engineering / Studiebureau Mouton bvba
- Location / BE - Zwevegem
- Period / 2019
A curtain wall attached to a building listed as a Belgian monument. It is made of Corten steel and tempered laminated glass to protect the existing boiler rooms. The whole project is completely suspended from the existing building complex without further support. This required meticulous measurements. The assembly at such a height was also a real challenge!