Stairs, railings and landings
La Hulpe Alix Le Clerc School
- Client / Collège notre dame des 3 Vallées
- Designer / CAT SAO sprl (Benoît Dangoisse)
- Location / BE - Terhulpen
- Period / 2016
An industrial fire escape made of galvanised steel with two central columns and cantilevered landings. The central wall consists of press welded grating and the parapet of perforated sheeting. The staircase is attached to the building with minimal visible fastenings. In addition, this staircase is equipped with integrated lighting.