Train, tram and bus stops
Chaudfontaine SNCB
- Client / NMBS
- Designer / Tuc Rail
- Engineering / Tuc Rail
- Location / BE - Chaudfontaine
- Period / 2019
A waiting shelter with a central gutter, a leaning rail and a bench. It is constructed out of galvanised and powder coated steel with wall covering of tempered laminated glass clamped between Forster profiles. The roof is made of sandwich panels and extends over the waiting area so that you can also wait outside the shelter. The roof has a drop ceiling of folded aluminium cassettes, integrated LED lighting and a drainage system.