Special projects
Campine North-South tunnel
- Client / Vlaamse Overheid
- Location / BE - Kasterlee
- Period / 2014
Six pavilions as emergency exits with wall cladding made of sandblasted and omega-folded corten steel with invisible fastenings. Each pavilion is a prefabricated unit that was welded together in our workshop while the wall cladding was attached to the structure on site.