Skip to main content

Special projects

Campine North-South tunnel

  • Client / Vlaamse Overheid
  • Location / BE - Kasterlee
  • Period / 2014
Six pavilions as emergency exits with wall cladding made of sandblasted and omega-folded corten steel with invisible fastenings. Each pavilion is a prefabricated unit that was welded together in our workshop while the wall cladding was attached to the structure on site.